Built for manufacturing operations

Transform operational chaos into algorithmic order, optimized to the best.

The complete optimization platform for field service teams. Optimal auto-scheduling, route optimization, and real-time visibility, all in one product.

−88%Scheduling time
+35%Billable capacity
−25%Drive time cut
The Hidden Cost of Chaos

Field-service schedulingis broken

Every inefficiency compounds. Disconnected tools and manual processes cost you time, money, and customers.

€120Kavg. annual loss
per team of 5 techs
Capacity Crisis

Overbooking & idle technicians

Half your team is overloaded while the other half has gaps. No AI scheduling means capacity planning stays a guessing game.

Up to 35% of paid time lost to scheduling gaps
Margin Drain

Inefficient routes eating margins

Unoptimized routes don't just cost fuel. They burn 25% more miles per day, delay customers, and quietly erode your margins.

Avg. 25% more miles driven from unoptimized routes
Blind Spots

No visibility until it's too late

You don't know a job is done until the tech calls in. That's 30 minutes per technician lost to manual check-ins, every single day.

30 min/tech/day lost to manual status-check calls
Sound familiar? There's a smarter way to run your field ops.
Sources
  1. 1ServiceTitan & MSI Data: field technician utilization benchmarks; industry average utilization 55-65%.
  2. 2Fieldproxy / FieldInsight: HVAC & field service route planning research, 2024-2025.
  3. 3Repair-CRM: Field Service Scheduling Software Guide, 2026.
  4. 4WeFaber estimate for a 5-technician Italian team: scheduling waste (35% × €250/day × 220 days × 5 = €96,250) + fuel waste (25% × 120 km/day × 9L/100km × €1.80/L × 220 days × 5 = €5,346) + comms overhead (30 min/tech/day × €31.25/h × 220 days × 5 = €17,188). Total: €118,784, rounded to €120K.
Cost of Chaos Calculator

What is chaos really costing you?

Move the sliders to match your operation. See the margin you bleed every year to manual scheduling and inefficient routes.

Your operation

5techs
120km/day
31€/h
2h/day

Your annual drain

Capacity CrisisBillable hours lost to scheduling gaps & manual coordination
€109,120
Margin DrainFuel & time burned on unoptimized routes
€5,346
Estimated annual loss€114,466drained from your bottom line

Estimates based on field-service benchmarks: 35% of paid time lost to scheduling gaps, 25% excess mileage on unoptimized routes, fuel at 9 L/100km × €1.80/L over 220 working days. Your actual figures will vary.

System Pipeline

Three stages. Zero wasted motion.

Schedule0territories mapped
Route1,240 kmon optimized routes
Monitor0jobs live now
Common questions

You ask? We answer.

Everything you need to know before bringing WeFaber to your operations team.

Still have questions? We're happy to walk you through it.

Get in touch
Early access open

Stop firefighting schedules.Start running optimally.

Replace spreadsheets and phone calls with algorithmic precision. Setup takes under a day.